inner_banner_news
You are here: News  /  Company News

FULONGMA Won the Bid for the Construction of A Wet Waste Treatment Station

2021-01-15 16:04:55

Share to:

Recently, the results of the EPC evaluation of the wet waste treatment station construction project in Xiangcheng District were announced, and FULONGMA became the first candidate to win the bid. This project is the first wet waste EPC project pre-winning by the Solid Waste Division of FULONGMA in 2021. The project uses FULONGMA’s self-developed food waste equipment and supporting leachate container equipment with core competitiveness. The winning of the bid reflects FULONGMA’s advantage as a comprehensive environmental sanitation solution provider and further consolidates the dominant position of the company’s entire industrial chain extension strategy.

Project Overview

Volume: 20t/d

Object: kitchen waste + leachate

Process: Aerobic fermentation

Content: Including a complete set of wet waste treatment equipment and supporting wastewater treatment equipment and auxiliary components, trash can cleaning equipment, information management system; design, construction, equipment installation, commissioning, and trial operation of buildings, etc.

Estimated total contract amount: 11.81 million RMB

Features: EPC mode, wastewater treatment meets the third-level standard of “Integrated Wastewater Discharge Standard”

 

In recent years, with the effective development of waste classification, the need for wet waste disposal is imminent. In response to the call of the development of the times, FULONGMA has made breakthroughs in the recycling of wet waste, explored a treatment method that meets China’s national conditions, committing to become a practitioner of urban and rural organic waste collection and transportation.

RELATED NEWS